Tiffin Motorhomes rvs for sale in Lake Katrine, New York

1-1 of 1

Sort By

1994 Tiffin Motorhomes Allegro Bay

1994 Tiffin Motorhomes Allegro Bay

$14,500

Lake Katrine, New York

Year 1994

Make Tiffin Motorhomes

Model Allegro Bay

Category Class A

Length 27

Posted Over 1 Month

Onan 4.0KW Genset; Norcold Fridge/Freezer (LP/Elec.); Colman 7,000 BTU Roof A/C;4 Burner LP Stovetop; Panasonic Microwave; 35,000 BTU LP ducted furnace; full shower;60 gal. fuel tank; 45 gal. fresh water tank; 32 gal. grey water tank; 32 gal black water tank; 6 gal. HW heater (LPG);double bed rear; sofa bed front; dinette-bed combo front; wired for TV/cable; non-smoker.-----------------------------------------------------------------------------------------------------------------------------------[2010-2016] SUMMARY of Mechanical R&R, Upgrades, Service, Interior and Exterior Renovations: [01] Mount & Balance 6 New LT245/75R16 E Tires. [02] Replace R/L front coil springs w/air bags and shocks. Replace Rear Shocks. Replace Steering Damper. Align front end. [03] Pressure test cooling system and check all hoses. [04] Flush cooling system and fill with coolant [-340 F]. [05] Check and test: furnace; fridge; converter; house batteries; isolator: all 'good', [06] Install second [deep cycle] house battery w/wiring and clamps. [07] Install full-width rear spray flap 'skirt'. [08] R&R genset and rebuild carb. [09] Rebuild R&L rear leaf springs; add one new leaf each side. [10] Replace center bolts, clips and axle U-bolts. Check all brakes (good). [11] R&R exhaust 'donut' gaskets; R&R exhaust manifold gaskets. [12] R&R broken bolts; install new air filter. [13] Custom fit & weld new folding entry steps. [14] R&R front wheels - replace 1 rim and balance. [15] R&R radiator clutch fan; remount/weld LR shock; replace selected exterior lights; troubleshoot rear wheels / drive train / vibration; R&R U-joints, carrier bearing & hanger. [16] R&R distributor rotor & cap, complete wire set, spark plugs (8), complete tune-up. [17] Remove and Replace Radiator; Clutch-Driven Auxilary Cooling Fan; all fittings. [18] Remove All Carpeting / Install New Tile Flooring. [19] Remove / Rebuild, Install New Head and Piping. [20] Repair and Upgrade Refrigerator/Freezer. [21] Roof: Strip, Prep, Install Liquid [two-step] Rubber Roof. [22] Remove Old Antenna, Rewire and Install New Antenna Upgrade. [23] Apply top coat of EPDM Liquid Rubber Roof (June 2016). [24] Supporting documentation.